EDWARD J. MARSHALL v. PORT AUTHORITY ALLEGHENY COUNTY AND MICHAEL BAKER (05/13/87)

COMMONWEALTH COURT OF PENNSYLVANIA


decided: May 13, 1987.

EDWARD J. MARSHALL
v.
PORT AUTHORITY OF ALLEGHENY COUNTY AND MICHAEL BAKER, JR., INC. PORT AUTHORITY OF ALLEGHENY COUNTY, APPELLANT. EDWARD J. MARSHALL V. PORT AUTHORITY OF ALLEGHENY COUNTY AND MICHAEL BAKER, JR., INC. MICHAEL BAKER, JR., INC., APPELLANT

Appeals from the Order of the Court of Common Pleas of Allegheny County in the case of Edward Marshall v. Port Authority of Allegheny County and Michael Baker, Jr., Inc., No. G.D. 82-23771.

COUNSEL

Louis C. Long, with him, Raymond H. Conaway, Meyer, Darragh, Buckler, Bebenek & Eck, for appellant, Port Authority of Allegheny County.

W. Arch Irvin, Jr., Wayman, Irvin & McAuley, for appellant, Michael Baker, Jr., Inc.

Edward J. Balzarini, Balzarini, Carey & Watson, for appellee, Edward J. Marshall.

Judges Craig and Doyle, and Senior Judge Narick, sitting as a panel of three. Opinion by Judge Craig.

Author: Craig

[ 106 Pa. Commw. Page 133]

The Port Authority of Allegheny County (PAT) and Michael Baker, Jr., Inc. appeal from a judgment entered in favor of Edward J. Marshall to compensate him for injuries he sustained while demolishing a bridge in a PAT construction project.

Mr. Marshall's complaint avers that he was employed as a laborer by the Mosites Construction Company in the construction of the PAT East Busway. Mr. Marshall testified that on January 13, 1981, at approximately 7:00 p.m., he stepped onto a steel beam on a bridge which was being dismantled. Workers had cut the beam earlier with an acetylene torch; when he placed his weight on it, the beam gave way and Mr. Marshall fell 15 to 20 feet to the ground below. Immediately after his fall, a steel beam landed on top of Mr. Marshall's legs, inflicting severe injuries.

Mr. Marshall filed suit against Michael Baker, Jr., Inc., an engineering firm retained by PAT for the construction project, and PAT. A jury determined that Baker had been negligent and that PAT was vicariously liable for the negligence of the Mosites Construction Company, the general contractor. After denying the defendants' motions for post-trial relief, Judge Farino of the Allegheny County Court of Common Pleas entered judgment holding PAT and Baker jointly and severally liable for Mr. Marshall's damages. Baker appealed the judgment to the Superior Court which transferred the case to this court to be consolidated with an appeal filed by PAT.

Port Authority Appeal

PAT contends that it is immune from liability in this case under section 8541 of the Judicial Code, 42 Pa. C.S. § 8541, the local agency immunity statute known as

[ 106 Pa. Commw. Page 134]

    the Political Subdivision Tort Claims Act. That section provides:

Governmental Immunity Generally

Except as otherwise provided in this subchapter, no local agency shall be liable for any damages on account of any injury to a person or property caused by any act of the local agency or an employee thereof or any other person.

The parties dispute whether PAT is a "local agency" for purposes of the Political Subdivision Tort Claims Act.*fn1 This court recently resolved a similar question in E-Z Parks, Inc. v. Larson, 91 Pa. Commonwealth Ct. 600, 498 A.2d 1364, aff'd per curiam, 509 Pa. 496, 503 A.2d 931 (1986), in which we held that the Philadelphia Parking Authority was a "local agency" under the immunity statute. Examination of the parking authority's enabling legislation, which created "a public body corporate and politic, exercising the public powers of the Commonwealth as an agency thereof," led this court to conclude that the authority fit squarely within the definition of "local agency" found in section 8501 of the Judicial Code, 42 Pa. C.S. § 8501.

[ 106 Pa. Commw. Page 135]

PAT's genesis lies in section 3(a) of the Second Class County Port Authority Act, 55 P.S. § 553(a),*fn2 which provides that:

There are hereby created bodies corporate and politic in counties of the second class, to be known as Port Authority of (insert name of county), which shall constitute public bodies corporate and politic; exercising the public powers of the Commonwealth as an agency thereof.

The Judicial Code broadly defines "local agency" as "[a] government unit other than the Commonwealth government." 42 Pa. C.S. § 8501. As in our E-Z Parks analysis, we observe that PAT -- as a public body corporate and politic -- fits squarely within the Act's definition of "local agency."*fn3 See also Rhoads v. Lancaster Parking

[ 106 Pa. Commw. Page 136]

Authority, Pa. Commonwealth Ct. , 520 A.2d 122 (1987). We conclude, therefore, that the liability Mr. Marshall seeks to impose on PAT is subject to the local immunity statute.*fn4

The parties next dispute the applicability of that act's "real property" exception to this case. Section 8542(b) provides:

(9) Acts which may impose liability. -- The following acts by a local agency or any of its employees may result in the imposition of liability on a local agency:

(3) Real Property. -- The care, custody or control of real property in the possession of the local agency, except that the local agency shall not be liable for damages on account of any injury sustained by a person intentionally trespassing on real property in the possession of the local agency. As used in this paragraph, 'real property' shall not include:

(i) trees, traffic signs, lights and other traffic controls, street lights and street lighting systems;

[ 106 Pa. Commw. Page 137]

(ii) facilities of steam, sewer, water, gas and electric systems owned by the local agency and located within right-of-way;

(iii) streets; or

(iv) sidewalks.

Mr. Marshall contends that, because PAT possessed the bridge and exerted control over it, the above-quoted real property exception subjects PAT to liability for all injuries occurring on the bridge or as a result of its demolition.

The trial judge instructed the jury on two theories by which PAT could be held liable for Mr. Marshall's injuries: (1) PAT was negligent; (2) the general contractor was negligent and PAT is vicariously liable as one who employed a contractor engaged in inherently dangerous work.*fn5

[ 106 Pa. Commw. Page 138]

The jury specifically found that PAT was not negligent but that, because the contractor was engaged in inherently dangerous work, PAT was vicariously liable as the party who retained the contractor. Accordingly, we must proceed on the basis that, even though the bridge may be regarded as being in PAT's possession, no act of PAT consisting of the "care, custody or control" of the bridge caused the injury. The jury rested PAT's liability on its status as a contracting party, not on its status as a possessor of land. Therefore we conclude that the "real property" exception does not apply to this case.*fn6

Because we have determined that PAT is a local agency protected under the local immunity act and that the real property exception to that act does not apply to the liability Mr. Marshall seeks to impose, we reverse the judgment entered in the Court of Common Pleas of Allegheny County as it applies to PAT.

Baker Appeal

[ 106 Pa. Commw. Page 139]

Mr. Marshall's complaint averred that Baker negligently supervised the contractor's demolition of the bridge. The basic elements of a cause of action founded on negligence are: duty, breach of duty, causal relationship between breach and resulting injury, and actual loss or damage. Casey v. Geiger, 346 Pa. Superior Ct. 279, 499 A.2d 606 (1985). A negligence claim cannot, however, be maintained upon facts as to which the law does not impose a duty. Williams By and Through Page 139} Williams v. Lewis, 319 Pa. Superior Ct. 552, 466 A.2d 682 (1983).

Duty, in any given situation, is predicated on the relationship existing between the parties at the relevant time. Morena v. South Hills Health System, 501 Pa. 634, 462 A.2d 680 (1983); Dumanski v. City of Erie, 348 Pa. 505, 34 A.2d 508 (1943). To understand the relationship between Baker, PAT and Mosites in the East Busway project, we look to the PAT-Baker contract and Baker's actual performance.

Baker argues that it was never obligated, under contract or in actual practice, to control the manner in which Mosites performed its work and therefore owed no duty to PAT or Mr. Marshall upon which a finding of negligence could be based.

The jury returned only a general finding of negligence against Baker. In his brief, however, Mr. Marshall offers five specific duties which, he contends, Baker owed and breached relating to the East Busway construction project.

First, Mr. Marshall contends that the jury could have reasonably found that Baker was negligent in approving and permitting the performance of ultrahazardous demolition work at night under unsafe conditions. The premise to that contention is that Baker was responsible for reviewing, with the authority to veto, working conditions proposed by Mosites.

We note that, under the original PAT-Baker contract, Baker specifically assumed the duty of "[r]eviewing contractors' practices and procedures to minimize hazards associated with construction operations." However, in supplemental PAT-Baker agreements, the parties eliminated Baker's safety review duty.*fn7 Therefore,

[ 106 Pa. Commw. Page 140]

    even though Mr. James T. Neill, a Mosites project superintendent, testified that he "had to clear" Mosites' addition of a nighttime work shift with Baker as well as PAT (N.T. 686-87), there is no evidence that Baker was responsible for assuring safe work conditions.

Mr. Marshall contends that section GP 4.11.5 of the PAT-Mosites contract creates an affirmative duty on Baker to halt construction (or demolition) if the contractor adopts hazardous work procedures. That section provides:

Failure of the Contractor to comply with any of the requirements of Article GP 4.11 [specifying safety standards] may be cause for the Authority to disqualify the Contractor from bidding on Authority work other than that encompassed by this Contract. In addition, should such failure create a hazard to life, limb or property, the Engineer may stop any operation of the Contractor affected by the failure until the failure is remedied.

The PAT-Mosites contract, however, cannot legally bind persons who are not parties to that contract. Chambers Development Co., Inc. v. Allegheny County Health Department, 81 Pa. Commonwealth Ct. 622, 474 A.2d 728 (1984). Although the quoted provision subjects Mosites to "the Engineer's" authority to halt construction, it does not bestow any duty on Baker, who was not a party to the contract, to monitor Mosites' section GP 4.11 compliance.

Second, Mr. Marshall contends that the jury could have reasonably found that Baker was negligent in permitting demolition work to proceed without requiring a demolition plan from Mosites. At trial, Mr. Marshall's attorneys established that Baker had required Mosites to submit a detailed demolition plan for another bridge (the South Avenue Bridge) in the same project. A cross-examination

[ 106 Pa. Commw. Page 141]

    of Mr. Hardy, PAT's Director of Engineering and Construction, revealed, however, that the demolition of the South Avenue bridge involved the use of explosives. Mr. Hardy testified that, under the terms of the PAT-Mosites contract, PAT specifically required Mosites to seek previous written approval for demolition if the demolition involved the use of explosives*fn8 (N.T. 63). Our review of the construction contracts reveals that Baker did not have to require or review demolition plans for the Penn Avenue bridge, from which Mr. Marshall fell, because that demolition did not involve the use of explosives.

Third, Mr. Marshall contends that the jury's verdict could be based on Baker's allegedly negligent investigation and recommendation of an unqualified contractor to perform the demolition work. Once again, however, nothing in the original PAT-Baker agreement, or supplemental agreements, imposes a duty on Baker to screen contractors for the EB-10 contract.*fn9 Furthermore, although Mr. Hardy testified that Baker participated in the decision to award the contract to Mosites (N.T. 24-25),

[ 106 Pa. Commw. Page 142]

    the record does not contain any evidence that Mosites was unqualified to demolish the bridge.*fn10

Fourth, Mr. Marshall contends that Baker's contract obligated it to require a written safety program from Mosites which it never obtained. However, the record does not contain any evidence to support Mr. Marshall's contention. To the contrary, the record contains the testimony of Raymond Budnick, a Baker employer, who identified Defendant's Exhibit E, which is a written safety program submitted by Mosites to Baker in a pre-construction meeting in November, 1980. (N.T. 1241, 1268-71.)

Fifth, Mr. Marshall contends that Baker breached its contractual obligation to provide on-site inspectors to insure that construction, or in this case demolition, proceeded according to contract specifications. Mosites' contract specifications incorporate by reference safety standards established in the Williams-Steiger Occupational Safety and Health Act of 1970 (OSHA).*fn11 Mr. Marshall alleges further that the nighttime demolition activity violated OSHA standards.

Section B(1) of the "Scope of Services" appendix to supplemental agreement No. 6 between PAT and Baker states that Baker shall:

Provide field engineers, inspectors, and support personnel to monitor the construction performed under Authority issued contracts, to assure delivery of the specified systems and facilities in

[ 106 Pa. Commw. Page 143]

    accordance with contract drawings and specifications.

Section B(1) is ambiguous because it appears to require Baker to monitor construction methods with an eye toward the OSHA-incorporated contract specifications. Yet Baker's oversight is required only "to assure delivery" of the finished product "in accordance with contract drawings and specifications." When contract language is ambiguous, we must examine extrinsic evidence to derive the parties' intent. Pennsylvania Department of Transportation v. Bracken Construction Co., 72 Pa. Commonwealth Ct. 620, 457 A.2d 995 (1983).

We note section GP 6.4 of the PAT-Mosites contract. That section provides:

SUPERVISION OF CONSTRUCTION

GP 6.4.1 The Contractor shall supervise and direct the Work, using his best skill and attention. He shall be solely responsible for all construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under the Contract. (Emphasis added.)

When these two contract provisions, describing the working relationship between Baker and Mosites, are read together, Baker's inspection duties appear to be limited to assuring that the project conforms to design specifications. To impose a duty on Baker to inspect demolition procedures for safety compliance would conflict with the sole responsibility granted to Mosites for its "construction means, methods, and techniques" under section GP 6.4.1. We conclude therefore that PAT delegated sole legal responsibility for OSHA compliance to Mosites. Consequently, Baker's inspection activities, or lack thereof, are immaterial to Mosites' OSHA compliance.

[ 106 Pa. Commw. Page 144]

Because Mr. Marshall has been unable to identify any legal basis for the duties which he alleges that Baker breached, we must conclude that Mr. Marshall has not established a cause of action in negligence, and that the trial judge erred, as a matter of law, in denying Baker's motion for judgment notwithstanding the verdict.

Accordingly, judgment entered against PAT and Baker is reversed.

Order in 1708 C.D. 1986

Now, May 13, 1987, the judgment entered in favor of Edward J. Marshall, against the Port Authority of Allegheny County and Michael Baker, Jr., Inc., by the Court of Common Pleas of Allegheny County, G.D. 82-23771, is reversed.

Order in 51 T.D. 1986

Now, May 13, 1987, the judgment entered in favor of Edward J. Marshall, against the Port Authority of Allegheny County and Michael Baker, Jr., Inc., by the Court of Common Pleas of Allegheny County, G.D. 82-23771, is reversed.

Disposition

Reversed.